What’s going on in the mechanical workshop?

The mechanical side of the lighthouse construction is being carried out by the wonderful Mark Long from the mechanical workshop. He’s been hard at work constructing the frames for both the large and small lights and attaching the grids of LEDs. After this, the interactive screens will need to be integrated, which will involve cutting holes into the outside of Lighty!

 


Posted

in

by

Tags:

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *